REBO heavy weight terminal
Heavy weight terminal
REBO is a unique terminal with direct access to open sea. Perfectly equipped for:
- project cargo
- offshore construction
- decommissioning of wind turbines
- decommissioning of oil and gas structures

Available infrastructure
- Heavy weight terminal up to 20 t/m²
- 800 m adapted heavy weight quay
- Reinforced seabed in front of the quay
- 15 hectares of reinforced gravel & paved area
- Ready-to-use surfaces over 10 tons/m² for storage
- (Un)loading goods on LOLO and RORO base
- RORO pontoon up to 650 tons
Top connection
- Direct access to open sea
- Priority for installation & crane vessels
- Direct connection to highway & railway
- Airport at 7 kms, no aircraft restrictions
- Waterway connection to inland waters